With the plumbing under the shower base and the web for supporting the base glued and glassed in, glassing the shower base in was a fairly simple task, except that first the drain panel had to be glued and glassed in first. Then the duflex shower base went in under the aft edge of the […]
The bathroom in the Port hull sits behind the wall that makes the stairwell and under the galley. In that room will be a vanity basin and toilet (and an escape hatch) and through the main bulkhead (where most other boats of this design have the bathroom and shower) will be the shower with a […]
Sorry for that rather long break in transmission. We can now resume normal programming. I have been quite busy working on the boat but too busy (or lazy) to write and upload the blog. I do apologise. Now I said I have been busy, that’s also not exactly true. Each year, at the start usually […]

